Service Bulletin All SBs
| SB Number | Revision | SB Type | Title | Date (YYYY-MM-DD) |
|---|---|---|---|---|
| SB 500-24-001 | A | Alert | Aft Power Distribution Center (APDC) Insulation Modification | 2007-05-31 |
Click on the button to download this Service Bulletin document.
SB Reason
There has been an instance where the bonding of the APDC insulation blanket on the APDC allowed the insulation blanket to move out of its intended location. It is possible that movement of the insulation blanket may restrict the cooling airflow to the APDC, inducing overheat and shutdown of the APDC.
SB Description
This Service Bulletin (SB) installs a retaining bracket that will prevent the APDC insulation blanket from moving and potentially restricting the cooling airflow to the APDC.
SB Compliance
Eclipse Aviation Corporation considers this to be a mandatory modification that must be accomplished within 30 calendar days from date of issue of this SB.
Effectivity
0001 - 0016
Export Control
These commodities, technology or software, were exported from the United States in accordance with the Export Administration Regulations. These commodities, technology or software are intended for use only in the End User’s country. An export license from the U.S. Department of Commerce may be required before these products can be re-exported, transferred, transshipped on a non-continuous voyage, or otherwise disposed of in any other country, either in their original form or after being incorporated into an end item. Diversion of this end-item or its use contrary to any applicable U.S. government license or to U.S. law is prohibited.